$2,300,000


The Early Childhood Center design was completed in a compressed schedule of less than two months to accommodate the school’s schedule. It consists of 16 classrooms, an administration building, and elevated covered walkways with stairs and ramps connecting the entire campus. The buildings are factory constructed, similar to a series of cottages with siding and shingles, placed on permanent foundations.