covington high renovation
covington, la

client:
st. tammany parish school board

construction cost:
$5,500,000

A major renovation of the 100,000 square foot main classroom building, constructed in the 1970s. Renovations include a new sprinkler system, central chiller HVAC system, lighting with controls, flooring,interior painting, new ceilings, and fire alarm upgrades. Existing smoke vent skylights were replaced with new, large light wells that allow an abundance of natural light in the corridors. Construction was completed in multiple phases over a two year period, while maintaining student occupancy. Existing chillers were also removed from the roof. New, higher efficiency, units were located in an enclosure at ground level, with sound panels to reduce mechanical noise.