Warning: Use of undefined constant slider - assumed 'slider' (this will throw an Error in a future version of PHP) in /nfs/c01/h05/mnt/4024/domains/msh-architects.com/html/wp-content/themes/romangie/project.php on line 31

Warning: Use of undefined constant slider_mobile - assumed 'slider_mobile' (this will throw an Error in a future version of PHP) in /nfs/c01/h05/mnt/4024/domains/msh-architects.com/html/wp-content/themes/romangie/project.php on line 38

mele printing
covington, la

client:
Mele Printing

construction cost:
$397,027


This is a design of a new facade along the building adjacent street and at front entry. This also included the re-design of the entry lobby, reception and conference room.

229 east kirkland street
covington, la 70433
studio@msh-architects.com
+1 985 898 0303

© 2019 msh architects, llc | privacy policy |

© 2019 msh architects, llc | privacy policy |